Road Work

Posted on Monday May 11, 2020 at 08:53AM

The road will be graded, and MG30 dust control protection applied this week (May 11, 2020).

Speed bumps will be installed after the dust control application.

There are a few frost boils that are scheduled to be repaired by the end of the month.

Author: Summer Village of Itaska Beach

Category:

Back to all News

Comment on our article:

Posts By Date

Popular Posts

Categories

Fill out my online form.

param.controller is [blogs]

param.action is [show_entry]